Project Overview
EHK Hydro Electric participated in the mechanical assembly activities of the generators at the Bala Saruu Hydropower Plant in Kyrgyzstan. The work was carried out to ensure that all equipment was installed in accordance with manufacturer requirements and prepared for commissioning.
Scope of Work
- Execution of generator mechanical assembly activities
- Installation of auxiliary equipment
- Mechanical alignment and tolerance checks
- Assembly quality control activities
- Site technical inspections
- Pre-commissioning preparation works
Activities Performed
EHK Hydro Electric actively participated in the mechanical assembly works of the generators and auxiliary systems at the Bala Saruu Hydropower Plant.
The work included assembly of generator components, verification of assembly tolerances and confirmation of compliance with technical specifications.
Mechanical alignment checks were carried out throughout the project, assembly quality was monitored and close coordination was maintained with other site teams.
Support was also provided during the completion of pre-commissioning preparations to ensure that the equipment was ready for operation.
EHK Contribution
EHK Hydro Electric contributed its mechanical assembly expertise throughout the project, supporting the safe and proper installation of equipment and ensuring readiness for the commissioning phase.