EHK

Project Overview

EHK Hydro Electric participated in commissioning, troubleshooting and maintenance activities on Ingeteam frequency converter systems at the ITY Gold Mine facility in Ivory Coast. The work was carried out to ensure reliable operation of the frequency converter systems and to support operational continuity.

Scope of Work

  • Commissioning of Ingeteam frequency converter systems
  • Frequency converter system inspections
  • Fault investigation and troubleshooting activities
  • Maintenance and technical field support
  • Verification of control, protection and auxiliary systems
  • Review of operating parameters
  • Technical reporting and engineering support

Activities Performed

EHK Hydro Electric actively participated in the commissioning, troubleshooting and maintenance processes of the Ingeteam frequency converter systems at the ITY Gold Mine facility.

The work included inspection of frequency converter equipment, auxiliary systems, control structure and operating parameters. During commissioning, system tests were carried out, operating conditions were monitored and necessary adjustments were performed.

For technical issues encountered during operation, troubleshooting activities were performed, system behavior was evaluated and corrective recommendations were provided. Maintenance activities also included general condition checks and technical inspections to support reliable operation.

EHK Contribution

EHK Hydro Electric provided technical support to the facility through its field experience in frequency converter commissioning, troubleshooting and maintenance activities.