Project Overview
EHK Hydro Electric participated in commissioning and technical support activities at the Mulembwe Hydropower Plant in Burundi. The work was carried out to ensure safe and reliable plant operation, verify system performance and support the optimization of operating parameters.
Scope of Work
- Execution of commissioning activities
- Inspection of generator and auxiliary systems
- Mechanical and electrical testing
- Verification of protection and control systems
- Support during performance testing
- Technical reporting and engineering support
Activities Performed
EHK Hydro Electric actively participated in the commissioning process of the Mulembwe Hydropower Plant.
The work included inspections of the generator, auxiliary systems and plant equipment, monitoring of commissioning tests and evaluation of the obtained results.
Based on field measurements and technical observations, system performance was assessed and recommendations were provided to improve operational reliability.
Throughout the commissioning process, EHK worked closely with the site team to support the achievement of safe and stable operating conditions.
EHK Contribution
EHK Hydro Electric provided independent technical expertise that contributed to the successful completion of commissioning activities, verification of system performance and reliable plant operation.