Project Overview
EHK Hydro Electric participated in the mechanical assembly activities of the Rwanguba Hydropower Plant project located in the Democratic Republic of Congo. The work was carried out to ensure that all equipment was installed in accordance with manufacturer requirements and prepared for commissioning.
Scope of Work
- Execution of mechanical assembly activities
- Installation of generator
- Installation of auxiliary systems
- Mechanical alignment and tolerance checks
- Quality control and site inspections
- Completion of mechanical preparations prior to commissioning
Activities Performed
EHK Hydro Electric actively participated in the mechanical assembly works performed at the Rwanguba Hydropower Plant project.
The work included installation of turbine, generator and auxiliary equipment, verification of assembly quality and confirmation of compliance with project requirements.
Mechanical measurements, alignment checks and site inspections were carried out, and all necessary preparations were completed before the commissioning phase.
EHK Contribution
EHK Hydro Electric contributed to the successful installation of the equipment and preparation for commissioning through its extensive field experience in mechanical assembly activities.